Highways planned maintenance

In Progress - Citywide

 

Streets for People works

After the successful completion of over 250 schemes in phase 1, work has now started on phase 2 of the Streets for People programme. Nottingham City Council has received £5.85 million investment from the Government’s Local Transport Plan to continue to make our neighbourhoods greener, safer, better places to get around.

The funding has been split between each ward, with areas most in need getting more funding. The works are identified by local people and prioritised by ward councillors, and are due to be completed by September 2025.

Our transport team will:

  • Upgrade pavements and walkways to make them safer, especially taking into consideration the needs of older people and those with less mobility
  • Repair roads and cycle paths to help us improve traffic flow and safety, across all twenty wards

 

Highways Planned Maintenance Programme

The Highways Planned Maintenance Programme is funded by Central Government using numerous Department for Transport (DfT) funding streams allocated to Nottingham, such as the Pot Hole Fund, Advanced Pot Hole Fund and Incentive Fund. For 2024/25 the total funds allocated to this programme is £3.1m.

This funding will be spent improving various roads within the city identified through a data led approach based on their condition. The programme is made up of both standard road resurfacing and preventative maintenance.  Highway assets such as structures and cycleways are also included in this programme.

 

List of schemes

WardRoadTypeInfoStart DateWork Stream
AspleyFenwick RoadResurfaceComplete20/01/2025SfP 24/25
AspleyDeepdene WayResurfaceComplete18/11/2024SfP 24/25
AspleyWinsford CloseResurfaceComplete13/01/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleyLimetree AvenueResidents Parking Scheme In DevelopmentSummer 2025SfP 24/25
AspleyWard wide Bin ReplacementComplete10/02/2025SfP 24/25
AspleyTiverton CloseFootway ResurfaceComplete13/01/2025SfP 24/25
AspleyWard Wide Planned PatchingComplete01/02/2025SfP 24/25
BasfordMount PleasantMicro AsphaltComplete07/06/2024LTP 24/25
BasfordMarlowe AvenueMicro AsphaltComplete07/06/2024LTP 24/25
BasfordWhitemoor RoadMicro AsphaltComplete08/04/2024LTP 24/25
BasfordAlpine StreetMicro AsphaltComplete09/04/2024LTP 24/25
BasfordStockhill LaneMicro AsphaltComplete11/04/2024LTP 24/25
BasfordBulwell LaneResurfaceProgrammed06/07/2025SfP 24/25
BasfordHeatherly DriveResurfaceComplete10/02/2025SfP 24/25
BasfordBroadhurst AvenueResurfaceComplete21/01/2025SfP 24/25
BasfordPercy StreetMicro AsphaltComplete10/04/2024LTP 24/25
BasfordWard Wide Parking RestrictionsIn DevelopmentSummer 2025SfP 24/25
BasfordPark Lane 2 New Bollards Complete15/01/2025SfP 24/25
BasfordWard Wide Bin ReplacementComplete17/02/2025SfP 24/25
BerridgeLamcote StreetMicro AsphaltComplete03/04/2024LTP 24/25
BerridgeSecond AvenueMicro AsphaltComplete06/04/2024LTP 24/25
BerridgeGladstone StreetMicro AsphaltComplete07/04/2024LTP 24/25
BerridgePremier RoadMicro AsphaltComplete07/04/2024LTP 24/25
BerridgeMaxwell CloseMicro AsphaltComplete05/04/2024LTP 24/25
BerridgeHadbury RoadResurfaceComplete24/02/2025SfP 24/25
BerridgeEgypt RoadResurfaceComplete03/02/2025SfP 24/25
BerridgeSuez Street AreaDropped Crossing ImprovementsIn DevelopmentSpring 2025SfP 24/25
BerridgeWard Wide Parking RestrictionsIn DevelopmentSummer 2025SfP 24/25
BerridgeWimbledon Road AreaResident Parking Scheme and Parking RestrictionsIn DevelopmentSummer 2025SfP 24/25
BestwoodLytham GardensMicro AsphaltComplete17/04/2024LTP 24/25
BestwoodMildenhall CrescentResurfaceComplete17/02/2025SfP 24/25
BestwoodSouthglade Road ResurfaceProgrammed28/07/2025SfP 24/25
BestwoodCottam Drive / Cottam GardensMicro AsphaltComplete17/03/2025SfP 24/25
BestwoodElmbridgeMicro AsphaltComplete26/03/2025SfP 24/25
BestwoodWard Wide Planned PatchingComplete01/12/2024SfP 24/25
BestwoodWard Wide Bin ReplacementComplete24/02/2025SfP 24/25
BilboroughBracebridge DriveResurfaceIn DevelopmentSummer 2025LTP 24/25
BilboroughStrelley RoadResurfaceComplete17/02/2025LTP 24/25
BilboroughChingford RoadResurfaceProgrammed28/07/2025SfP 24/25
BilboroughWoodhouse WayResurfaceProgrammed06/05/2025SfP 24/25
BilboroughBurnside RoadMicro AsphaltComplete24/03/2025SfP 24/25
BilboroughGlaisdale DrivePlanned Patching In DevelopmentSpring 2025SfP 24/25
BilboroughWollaton ValeFootway ResurfaceIn DevelopmentSummer 2025SfP 24/25
BulwellSquires AvenueResurfaceLive07/04/2025SfP 24/25
BulwellLime Street / Muriel StreetResurfaceComplete29/11/2024SfP 24/25
BulwellSquires AvenueResurfaceLive07/04/2025SfP 24/25
BulwellArmstrong RoadMicro AsphaltComplete22/03/2025SfP 24/25
BulwellWard wide Planned PatchingComplete01/12/2024SfP 24/25
Bulwell ForestBrora RoadMicro AsphaltComplete16/04/2024LTP 24/25
Bulwell ForestHucknall RoadMicro AsphaltComplete23/03/2025LTP 24/25
Bulwell ForestRidgewayResurfaceComplete03/03/2025SfP 24/25
Bulwell ForestSt Albans Road ResurfaceIn DevelopmentSummer 2025SfP 24/25
Bulwell ForestBestwood Road Retread Complete27/03/2025SfP 24/25
Bulwell ForestPiccadillyPlanned PatchingComplete01/02/2025SfP 24/25
Bulwell ForestBelmont Avenue Retread Complete26/03/2025SfP 24/25
Bulwell ForestTorkard Drive/Old Farm RoadDropped Crossing ImprovementsIn DevelopmentSummer 2025SfP 24/25
Bulwell ForestWard Wide Planned PatchingIn DevelopmentSpring 2025SfP 24/25
Bulwell ForestTorkard Drive/Old Farm RoadDropped Crossing ImprovementsIn DevelopmentSummer 2025SfP 24/25
CastleShakespeare StreetResurface & BinderProgrammed04/08/2025LTP 24/25
CastleClumber StreetResurfaceIn DevelopmentSummer 2025LTP 24/25
CastleClumber StreetResurfaceIn DevelopmentSummer 2025SfP 24/25
CastlePlumptre StreetResurfaceComplete10/03/2025SfP 24/25
CastleSt James's TerraceResurfaceComplete15/03/2025SfP 24/25
CastleOld Lenton StreetJunction RealignmentIn DevelopmentSpring 2025SfP 24/25
CastleWard Wide Bin ReplacementComplete03/03/2025SfP 24/25
CastleWard Wide New Trees/Urban Greening In DevelopmentSpring 2025SfP 24/25
Clifton EastDungannon RoadResurfaceLive07/04/2025SfP 24/25
Clifton EastClifton LaneResurfaceIn DevelopmentSummer 2025SfP 24/25
Clifton EastOldoak RoadResurfaceComplete22/11/2024SfP 24/25
Clifton EastGreencroft AreaResidents Parking SchemeIn DevelopmentSummer 2025SfP 24/25
Clifton EastFarnborough RoadRaised Plateau ResurfacingIn DevelopmentTo Be ConfirmedSfP 24/25
Clifton EastWard wide Bin ReplacementComplete10/03/2025SfP 24/25
Clifton EastMiddlefell WaySlurry SealComplete18/03/2025SfP 24/25
Clifton NorthRuddington LaneMicro AsphaltComplete21/04/2024LTP 24/25
Clifton WestVillage RoadRetreadComplete26/03/2025LTP 24/25
Clifton WestBrookthorpe WayMicro AsphaltComplete19/03/2025SfP 24/25
Clifton WestPieris DriveMicro AsphaltComplete18/03/2025SfP 24/25
Clifton WestHolgateRetreadComplete26/03/2025SfP 24/25
DalesCardale RoadResurfaceComplete19/08/2024LTP 24/25
DalesHereford RoadRetreadComplete24/03/2025SfP 24/25
DalesHereford RoadResurfaceProgrammed24/07/2025SfP 24/25
DalesDaleview RoadRetreadLive31/03/2025SfP 24/25
DalesBewick Drive AreaDropped Crossing ImprovementsIn DevelopmentSpring 2025SfP 24/25
HGAIreton StreetMicro AsphaltComplete06/04/2024LTP 24/25
HGABentinck RoadResurfaceComplete07/10/2024LTP 24/25
HGANewstead GroveResurfaceComplete27/01/2025SfP 24/25
HGAA610 Bobbers Mill Bridge Road Safety Improvements In DevelopmentSummer 2025SfP 24/25
HGADarley Road and Darley Avenue Micro AsphaltComplete17/03/2025SfP 24/25
HGAKnighton AvenueMicro AsphaltComplete25/03/2025SfP 24/25
HGAWard Wide Planned Patching In DevelopmentSpring 2025SfP 24/25
HGAGill Street and Hampden Street Dropped Crossing ImprovementsIn DevelopmentSpring 2025SfP 24/25
HGAWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
Leen ValleyBeechdale RoadHFSComplete01/11/2024LTP 24/25
Leen ValleyAspley LaneMicro AsphaltComplete18/04/2024LTP 24/25
Leen ValleyNuthall RoadResurfaceProgrammed14/07/2025LTP 24/25
Leen ValleyWestern BoulevardResurfaceProgrammed14/07/2025LTP 24/25
Leen ValleyHolbeck RoadResurfaceComplete01/11/2024LTP 24/25
Leen ValleyWilkinson StreetResurfaceComplete23/09/2024LTP 24/25
Leen ValleyTrentham DriveResurfaceLive20/03/2025SfP 24/25
Leen ValleyWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
Leen ValleyWard Wide Planned Patching Complete01/12/2024SfP 24/25
LWEGregory StreetMicro AsphaltComplete20/04/2024LTP 24/25
LWELenton LaneMicro AsphaltComplete02/04/2024LTP 24/25
LWEHawton CrescentResurfaceLive07/04/2025SfP 24/25
LWENewland CloseResurfaceComplete14/03/2025SfP 24/25
LWETrinity Avenue / Church Avenue / Albert Road / Lois AvenueMicro AsphaltComplete22/03/2025SfP 24/25
LWEScalford DriveMicro AsphaltComplete21/03/2025SfP 24/25
LWEBroughton Drive/Austrey AvenueParking Restrictions In DevelopmentSummer 2025SfP 24/25
MapperleyDagmar GroveMicro AsphaltComplete04/04/2024LTP 24/25
MapperleyMapperley RoadMicro AsphaltComplete04/04/2024LTP 24/25
MapperleyMapperley RiseMicro AsphaltComplete03/04/2024LTP 24/25
MapperleySpringwood GardensRetreadComplete25/03/2025LTP 24/25
MapperleyBrewsters Road ResurfaceComplete24/02/2025SfP 24/25
MapperleyBoynton RoadMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyWoodlane GardensMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyEaton StreetMicro AsphaltComplete23/03/2025SfP 24/25
MeadowsQueens Drive (Phase 1)ResurfaceComplete09/09/2024LTP 24/25
MeadowsWilford Crescent EastResurfaceIn DevelopmentSummer 2025LTP 24/25
MeadowsQueens Drive (Phase 2)ResurfaceComplete04/11/2024LTP 24/25
MeadowsBathley StreetResurfaceComplete11/03/2025SfP 24/25
MeadowsQueen's Road New Pedestrian Crossing In DevelopmentSpring 2025SfP 24/25
MeadowsQuayside Close/ Meadows Close and Beauvale Road Residents Parking SchemeIn DevelopmentSummer 2025SfP 24/25
MeadowsBunbury StreetMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsBurge CloseMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsBathley StreetSlurry SealComplete04/03/2025SfP 24/25
MeadowsRobin Hood WayFootpath Improvements In DevelopmentSummer 2025SfP 24/25
MeadowsColliery Close Surfacing and Drainage Improvements In DevelopmentSummer 2025SfP 24/25
RadfordSalisbury StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordSalisbury SquareMicro AsphaltComplete09/04/2024LTP 24/25
RadfordMiddleton StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordMiall StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordBright StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordWellington SquareMicro AsphaltComplete06/04/2024LTP 24/25
RadfordGraham StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordFaraday RoadMicro AsphaltComplete10/04/2024LTP 24/25
RadfordGarden StreetMicro AsphaltComplete07/04/2024LTP 24/25
RadfordBalfour RoadResurfaceComplete10/03/2025SfP 24/25
RadfordDouglas RoadResurfaceComplete24/03/2025SfP 24/25
RadfordNorton StreetMicro AsphaltComplete22/03/2025SfP 24/25
RadfordArgyle StreetMicro AsphaltComplete24/03/2025SfP 24/25
RadfordWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
Basford & SherwoodValley RoadMicro AsphaltComplete18/03/2025LTP 24/25
SherwoodLongdale DriveResurfaceComplete12/08/2024LTP 24/25
SherwoodWhatton Rise / Bradmore RiseResurfaceComplete06/01/2025SfP 24/25
SherwoodMansfield Rd Area Residents Parking and Car Parks Scheme In DevelopmentSummer 2025SfP 24/25
SherwoodPerry Road Planned Patching On site 31/01/2025SfP 24/25
SherwoodLoscoe Road CyclewayIn DevelopmentSpring 2025SfP 24/25
SherwoodWinchester Street CyclewayOn site Spring 2025SfP 24/25
SherwoodWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
St Ann'sRobin Hood StreetResurfaceProgrammed22/04/2025SfP 24/25
St Ann'sCardinal CloseResurfaceComplete13/12/2024SfP 24/25
St Ann'sTeak CloseResurfaceComplete18/12/2024SfP 24/25
St Ann'sKilbourn StreetResurfaceComplete10/03/2025SfP 24/25
St Ann'sConway Close ResurfaceComplete10/03/2025SfP 24/25
St Ann'sSherwin Walk Highway ImprovementsIn DevelopmentSummer 2025SfP 24/25
St Ann'sWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
St Ann'sLotus CloseMicro AsphaltComplete24/03/2025SfP 24/25
St. AnnsCarlton RoadMicro AsphaltComplete02/04/2024LTP 24/25
St. AnnsLower Parliament StreetResurfaceComplete01/08/2024LTP 24/25
Wollaton WestSmithson DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestDovecote DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestGrangewood RoadMicro AsphaltComplete25/03/2025LTP 24/25
Wollaton WestWollaton Road (Access Road)Micro AsphaltComplete15/04/2024LTP 24/25
Wollaton WestArleston DriveResurfaceProgrammed16/07/2025LTP 24/25
Wollaton WestWollaton Road ResurfaceProgrammed19/05/2025SfP 24/25
Wollaton WestRenfrew DriveRetreadLive03/04/2025SfP 24/25
Wollaton WestWard Wide Bin ReplacementIn DevelopmentSpring 2025SfP 24/25
BilboroughWoodhouse WayReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
MeadowsQueens DriveResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
DalesDaleside RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
Wollaton WestGrangewood RoadMicro AsphaltIn DevelopmentTo Be ConfirmedLTP 25/26
Wollaton WestRosedale DriveMicro AsphaltComplete23/03/2025LTP 25/26
BerridgeArno AvenueMicro AsphaltComplete25/03/2025LTP 25/26
BerridgeWiverton RoadMicro AsphaltComplete25/03/2025LTP 25/26
Leen ValleyBexleigh GardensMicro AsphaltComplete25/03/2025LTP 25/26
RadfordDorking RoadMicro AsphaltComplete25/03/2025LTP 25/26
RadfordBovill StreetMicro AsphaltComplete26/03/2025LTP 25/26
BestwoodSouthglade RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
BestwoodBeckhampton RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
SherwoodPerry RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
AspleySherborne RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
RadfordBastion StreetResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BerridgeExeter RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
HGAColville StreetReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
BasfordLlanberis GroveReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
AspleyWithern RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
AspleyColeby RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
Clifton EastWoodkirk RoadReconstructionIn DevelopmentTo Be ConfirmedLTP 25/26
LWESelston DriveRetreadComplete26/03/2025LTP 25/26
MapperleyMapperley Hall DriveRetreadLive01/04/2025LTP 25/26
Wollaton WestRussell AvenueRetreadComplete28/03/2025LTP 25/26
BasfordBarlock RoadRetreadLive08/04/2025LTP 25/26

 

Feedback Survey

If we have finished work in your area, then we would love to know your feedback.

Click here to fill in the survey.

Related news

Picture1

Streets for People programme is paving the way for easier travel

Nearly 135 Streets for People schemes have been completed so far across the city and work is on track to finish in March 2024.

Find out more
Before-s4p

Streets for People programme making good progress

In 2021, the council successfully bid as part of a competitive process for £18 million from the Government’s Levelling Up fund to improve streets and local town centres and make walking and cycling easier and safer.

Find out more
Streets for People improvements

Roads and paths improved thanks to Streets for People programme

Over 250 schemes, including resurfacing more than 100km of roads and paths, have been completed as part of the Streets for People programme. With additional funding secured, the programme can now continue later in the year.

Find out more

Sign up to the transport newsletter

Roadworks bulletin every Friday
and monthly project updates.

Sign up for email updates

 

Enter your email address below to sign up for updates or to access your subscriber preferences.